2026 Service Fees
The following user fees and service charges apply to InnServices water, wastewater, construction, and engineering-related services.
Effective April 1, 2026
Updated October 2025
[Download Full PDF]
WATER
The following fees apply to water service connections, meter services, hydrant meters, construction water, and related operational services.
1.0 Connection Fee
| Service | Fee |
|---|
| Disconnect | $176.40 |
| Reconnect | $176.40 |
| Account Set-Up | $49.61 |
| NSF Fee | $16.54 |
2.0 Fire Sprinkler Connection
| Service | Fee |
|---|
| Fire Sprinkler Connection Annual Charge | $110.25 |
3.0 Meter Inspection and MXU Connection
| Service | Fee |
|---|
| 3/4" Meter Assembly with Combination Shut Off Valve, Meter & Check Valve, MXU | $926.10 |
| 1" Meter Assembly with Combination Shut Off Valve, Meter & Check Valve, MXU | $1,102.50 |
All other sizes and configurations will be based on Time & Materials.
4.0 Bulk Water Including Pool Fills
| Service | Fee |
|---|
| Application – One Time | $363.83 |
| Pool Based on 41,000L | $551.25 |
| Bulk Water Rate (m³) | $5.69 |
Bulk water from the Innisfil Heights Bulk Water Station will be billed monthly.
5.0 Construction Water - Hydrant Meters
| Service | Fee |
|---|
| Damage Deposit – Hydrant Meter | $3,858.75 |
| Installation or Removal of Hydrant Meter | $154.35 |
| Weekly Rental of Hydrant Meter (after first two weeks) | $77.18/week |
| Minimum Charge – Service Charge for Supply of Water During Construction | $275.63 |
| Normal Billing Rates Apply Beginning on Day of Metering Equipment Installation | $5.69 |
6.0 Water Meter Flow Testing Fee
| Service | Fee |
|---|
| Meter Testing Fee | $518.18 + 3rd Party Meter Testing Fee |
If the metering equipment test is found to be inaccurate, consumption adjustments will be made and no fee will be charged.
7.0 Damaged Meter Replacement Fee
| Service | Fee |
|---|
| Damaged Residential Meter Replacement | $275.63 |
8.0 Watermain Line Tapping Charge
| Service | Fee |
|---|
| Watermain Line Tapping Charge (25 mm diameter or less) | Full Cost Recovery |
9.0 Construction Water
| Service | Fee |
|---|
| During Normal Working Hours Plus Hourly Rate for Staff to Operate Town Equipment | Full Cost Recovery |
| Construction Water Before Water Meter Connected | $176.40 |
Construction water fees are collected at permit issuance.
10.0 Staff Charges - Straight Time
| Position | Rate |
|---|
| Manager | $198.45 |
| Chief Compliance Officer | $237.04 |
| Administrative Coordinator | $126.79 |
| Water Operator / Technicians / Technologists | $154.35 |
| Supervisor | $187.43 |
| Director of Operations | $237.04 |
| Safety & Risk Specialist | $192.94 |
| Risk & Compliance Manager | $181.91 |
| Co-Op Student | $104.74 |
11.0 Other
| Service | Fee |
|---|
| NEW Service Connection Per Application for Additional Connection(s) | $716.63 |
| NEW Combined Water & Wastewater Additional Service Connection Application | $1,047.38 |
| Missed Appointments | $181.91 |
| Staff Called Out But Plumbing Not Ready | $181.91 |
| Hydrant Flow Test | Minimum $220.50 / Full Cost Recovery |
Additional Information
- All water passing through a meter will be billed whether used or wasted.
-
If a meter fails to register, the customer will be charged based on average consumption during the previous billing period.
-
Additional quotes may be requested on jobs not listed.
-
User fees quoted may be based on Full Cost Recovery.
-
All activities are within field staff working hours (7:00 a.m. to 3:30 p.m. Monday to Friday).
-
After normal working hours, a minimum 4-hour charge applies.
-
Additional charges may apply where more than standard labour is required.
-
Please contact InnServices to request a quote.
WASTEWATER
The following fees apply to wastewater services, septic receiving services, additional connections, and related operational support services.
| Service | Fee |
|---|
| Bulk Septage | $22.05 |
| Processed Waste | $24.26 |
| Septic Receiving Station Fob/Gate Remote Fee | Full Cost Recovery |
Staff Billing Rates
| Position | Rate |
|---|
| Manager | $198.45 |
| Chief Compliance Officer | $237.04 |
| Supervisor | $187.43 |
| Administrative Coordinator | $126.79 |
| Wastewater Operator | $154.35 |
| Director of Operations | $237.04 |
| Safety & Risk Specialist | $192.94 |
| Risk & Compliance Manager | $181.91 |
| Co-Op Student | $104.74 |
Additional Connections
| Service | Fee |
|---|
| Additional Service Connection Application | $716.63 |
| Combined Water & Wastewater Additional Service Connection Application | $1,047.38 |
| Construction Costs | Full Cost Recovery |
Additional Information
- All wastewater charges will be billed based on the amount of water passing through a meter whether used or wasted.
-
After-hours work is subject to a minimum 4-hour charge.
-
Additional quotes may be required for services not listed.
-
Additional charges may apply where more than standard labour is required.
-
Please contact InnServices to request a quote.
ENGINEERING
The following fees apply to engineering, technical support, project management, asset management, and related operational services.
| Position | Rate |
|---|
| Capital Project Manager | $181.91 |
| Engineering Manager | $214.99 |
| Utility Technologist | $165.38 |
| Associate Engineer | $165.38 |
| Asset Management | $187.43 |
| Co-Op Student | $104.74 |