InnServices Logo

2026 Service Fees

Browse current 2026 InnServices user fees and service charges, effective April 1, 2026.

2026 Service Fees

The following user fees and service charges apply to InnServices water, wastewater, construction, and engineering-related services.

Effective April 1, 2026
Updated October 2025

[Download Full PDF]


WATER

The following fees apply to water service connections, meter services, hydrant meters, construction water, and related operational services.

1.0 Connection Fee

ServiceFee
Disconnect$176.40
Reconnect$176.40
Account Set-Up$49.61
NSF Fee$16.54

2.0 Fire Sprinkler Connection

ServiceFee
Fire Sprinkler Connection Annual Charge$110.25

3.0 Meter Inspection and MXU Connection

ServiceFee
3/4" Meter Assembly with Combination Shut Off Valve, Meter & Check Valve, MXU$926.10
1" Meter Assembly with Combination Shut Off Valve, Meter & Check Valve, MXU$1,102.50

All other sizes and configurations will be based on Time & Materials.

4.0 Bulk Water Including Pool Fills

ServiceFee
Application – One Time$363.83
Pool Based on 41,000L$551.25
Bulk Water Rate (m³)$5.69

Bulk water from the Innisfil Heights Bulk Water Station will be billed monthly.

5.0 Construction Water - Hydrant Meters

ServiceFee
Damage Deposit – Hydrant Meter$3,858.75
Installation or Removal of Hydrant Meter$154.35
Weekly Rental of Hydrant Meter (after first two weeks)$77.18/week
Minimum Charge – Service Charge for Supply of Water During Construction$275.63
Normal Billing Rates Apply Beginning on Day of Metering Equipment Installation$5.69

6.0 Water Meter Flow Testing Fee

ServiceFee
Meter Testing Fee$518.18 + 3rd Party Meter Testing Fee

If the metering equipment test is found to be inaccurate, consumption adjustments will be made and no fee will be charged.

7.0 Damaged Meter Replacement Fee

ServiceFee
Damaged Residential Meter Replacement$275.63

8.0 Watermain Line Tapping Charge

ServiceFee
Watermain Line Tapping Charge (25 mm diameter or less)Full Cost Recovery

9.0 Construction Water

ServiceFee
During Normal Working Hours Plus Hourly Rate for Staff to Operate Town EquipmentFull Cost Recovery
Construction Water Before Water Meter Connected$176.40

Construction water fees are collected at permit issuance.

10.0 Staff Charges - Straight Time

PositionRate
Manager$198.45
Chief Compliance Officer$237.04
Administrative Coordinator$126.79
Water Operator / Technicians / Technologists$154.35
Supervisor$187.43
Director of Operations$237.04
Safety & Risk Specialist$192.94
Risk & Compliance Manager$181.91
Co-Op Student$104.74

11.0 Other

ServiceFee
NEW Service Connection Per Application for Additional Connection(s)$716.63
NEW Combined Water & Wastewater Additional Service Connection Application$1,047.38
Missed Appointments$181.91
Staff Called Out But Plumbing Not Ready$181.91
Hydrant Flow TestMinimum $220.50 / Full Cost Recovery
Additional Information
  • All water passing through a meter will be billed whether used or wasted.
  • If a meter fails to register, the customer will be charged based on average consumption during the previous billing period.
  • Additional quotes may be requested on jobs not listed.
  • User fees quoted may be based on Full Cost Recovery.
  • All activities are within field staff working hours (7:00 a.m. to 3:30 p.m. Monday to Friday).
  • After normal working hours, a minimum 4-hour charge applies.
  • Additional charges may apply where more than standard labour is required.
  • Please contact InnServices to request a quote.

WASTEWATER

The following fees apply to wastewater services, septic receiving services, additional connections, and related operational support services.

ServiceFee
Bulk Septage$22.05
Processed Waste$24.26
Septic Receiving Station Fob/Gate Remote FeeFull Cost Recovery

Staff Billing Rates

PositionRate
Manager$198.45
Chief Compliance Officer$237.04
Supervisor$187.43
Administrative Coordinator$126.79
Wastewater Operator$154.35
Director of Operations$237.04
Safety & Risk Specialist$192.94
Risk & Compliance Manager$181.91
Co-Op Student$104.74

Additional Connections

ServiceFee
Additional Service Connection Application$716.63
Combined Water & Wastewater Additional Service Connection Application$1,047.38
Construction CostsFull Cost Recovery
Additional Information
  • All wastewater charges will be billed based on the amount of water passing through a meter whether used or wasted.
  • After-hours work is subject to a minimum 4-hour charge.
  • Additional quotes may be required for services not listed.
  • Additional charges may apply where more than standard labour is required.
  • Please contact InnServices to request a quote.

ENGINEERING

The following fees apply to engineering, technical support, project management, asset management, and related operational services.

PositionRate
Capital Project Manager$181.91
Engineering Manager$214.99
Utility Technologist$165.38
Associate Engineer$165.38
Asset Management$187.43
Co-Op Student$104.74

Documents