Water and Wastewater Rates
The Water and Wastewater Rates By-law (025-24) came into effect on April 1, 2024.
2024 Water and Wastewater Rates Brochure
The new 2025 Water and Wastewater Rates come into effect on April 1, 2025
Water Rates
| Base Rate | 2024 ($) | Change (%) |
|---|
| Residential | 318.94 | 4.89 |
| Commercial | 569.12 | 4.91 |
| Industrial | 1,280.44 | 4.56 |
| Institutional | 3,317.99 | 4.86 |
| Per Cubic Meter (m3) | | |
| All Services | 2.43 | |
Wastewater Rates with Water Connection
| Base Rate | 2024 ($) | Change (%) |
|---|
| Residential | 246.01 | 7.97 |
| Mixed Use | 492.23 | 7.92 |
| Commercial & Industrial | 1,265.14 | 7.92 |
Institutional
| 7,593.13 | 7.98 |
Per Cubic Meter (m3)
| | |
| All Services | 1.62 | 6.99 |
Wastewater Rates without Water Connection
| Flat Rate | 2024 ($) | Change (%) |
|---|
| Residential | 613.39
| 6.95 |
| Mixed Use | 859.09 | 7.27 |
| Commercial & Industrial | 1,966.03 | 7.26 |
| Institutional | 11,655.11 | 7.24 |
Sandy Cove Acres Wastewater Rate
| Base Rate | 2024 ($) | Change (%) |
|---|
70% of Annual Residential Wastewater
| 172.20 | 7.97 |